The engine is in!

What a milestone!  The engine and gearbox are in!  Now that I have run all the lines down the transmission tunnel (thanks Dave for the tip) I could finally bolt the engine into place.  Surprisingly it went in a whole smoother than I expected.  I had my trusty helper...

Final fitment of the clutch…hopefully :)

Previously the gearbox and clutch was all bolted together as a trial to make sure I did manage to get the right flywheel and clutch combo. Everything was right and fitted perfectly. So today I pulled the gearbox off the motor so I can tighten and torque everything up....
Rear brakes all bolted together

Rear brakes all bolted together

Now that Sam at SQ Engineering had tidied up the axle flanges, I can bolt the whole rear brake assembly together to see how it will look and line up. It will also give me a chance to see if and how much my wheels wont fit under the guards. I had planned on widening...

Axles machined, diff brackets welded up…

Finally I got around to having the flanges on my axles machined down to suit the new Audi disc rotors. With the help of Sam from SQ Engineering I got the outer edge of the axle machined down ever so slightly to allow the disc to slide over. Sam did a great and very...

Water routing on the 20v

Another great service SQ offer is custom water routing kits for the 4age 20v. Whilst I was there I picked up a rear water bypass unit. The unit replaces the rear thermostat housing. The bypass was tapped to suit the standard 20v water temp sensor and a 1/8 NPT fitting...

Engine mounts, soon the engine will go in…

It’s funny how even the smallest things excite when it comes to my clubbie. Today my not so exciting to everyone else (apparently), engine mounts came. My friends think it’s ridiculous how excited I get over 2 little chunks of rubbery metal. I am lucky...